Chongqing YongPu Thermoelectric Boiler Auxiliary Equipment Manufacturing Co., Ltd...
AUXILIARY BOILER
Chongqing YongPu Thermoelectric Boiler Auxiliary Equipment Manufacturing Co., Ltd
AUXILIARY BOILER
Your present position:Home > AUXILIARY BOILER
(86)023-67480833
E-mail:xsb001@ypboiler.com
The secondary dust removal desulfurization precipitator
Theworkingprocess Thefluegas--Ceramicmulti-tubedustcatcher--Wen`spipe--desulfurizationprecipitator--Induceddraftfan--Thechimney Theworkingprinciple Whendustygasinandoutbytheintakepipeoftheceramicmulti-tubedustcatcher(adoptceramicmulti-tube

The working process

The flue gas--Ceramic multi-tube dust catcher--Wen`s pipe--desulfurization precipitator--Induced draft fan--The chimney

The working principle
 

When dusty gas in and out by the intake pipe of the ceramic multi-tube dust catcher ( adopt ceramic multi-tube cyclone
dust catcher in advance dedust) Gas distribution room and into the ceramic cyclone body and annular
space between the deflector, inducer make gas by the linear motion into circular motion ,For the most part of rotating 
airflow along the whirlwind since the cylinder spiral downward, flow in the vertebral body,Dusty gases produced in the 
process of rotating centrifugal force, the density is greater than the gas of the dust particles into cylinder wall.Dust
particles in contact with the wall, then lose its motive force of inertia force and depends on the inlet velocity and down
gravity fall into ash discharging mouth after down the wall into the total ash hopper.Rotate falling out air reaches the
bottom vertebral bodies, because of the contraction of cone immediately in the same direction of rotation in the cyclone 
tube axis direction bottom-up spiral flow net (gas), continue to do after ceramic cyclone exhaust pipe, into the exhaust
chamber, by always vent discharge.
The flue gas passes through the Wen`s tube throat scale Airflow velocity from slow to fast to slow, at the entrance of
 throat contact with injection atomization lye fully mixing, part of the SO2 absorbed by alkali, fine pinky particles in the 
smoke is aerosol wet and cohesion, make its density increases Flue gas after pre dust removal desulfurization and 
humidifying along the bottom slice again to enter the water film dust remover (emission standard can meet the national 
second class area) simplified (simplified as a circular cylinder) inside the cylinder rotate rise, upper water injection water
(liquid) absorption from the filter into the overflow tank, in the form of the overflow mouth into the ladle The whole barrel 
wall to form a layer of water film flowing from, dust gas under the action of centrifugal force, and simplified, the water film
 friction lining, formed the good gas-liquid contact condition, Such dust gas membrane (liquid) absorption by water wet
 capture, SO2 in the gas, dust is absorbed
 by the water film (liquid) absorption (FGD)Wet dust particles with flow to the overflow water film dust remover at the 
bottom of the barrel, walk from spillway hole row, after dust removal desulfurization of flue gas by the tower outlet duct 
into the induced draft fan, complete the whole process Back cover with water seal tank at the bottom of the cylinder, in 
order to prevent gas leakage from the bottom and a cleaning eye for the bottom of the barrel clean up After cleaning 
wastewater by the overflow hole at the bottom of the discharge into the sedimentation tank, neutralization precipitation, 
circulation use.If adding desulfurizer in the pool, because the air in the desulfurization tower for longer than three seconds, 
such gas liquid have longer exposure time, is advantageous to the carbon dioxide and the reaction of the desulfurizer.
At the same time, in order to facilitate the desulfurization system maintenance and deal with an emergency, can build a 
bypass flue.

Equipment technical parameters

1.Dust removal efficiency®R98%
2.The desulfurization efficiency ®R85%
3.Dust emission concentration ®Q200mg/Nm3
4.SO2 Emission concentration ®Q400mg/Nm3
5.Ringelman black < grade 1 
6.resistance<2000Pa


Primary dedusting configuration:

The flue gas--Ceramic multi-tube dust catche--Induced draft fan--chimney
Thefluegas--Wen`s pipe-- water film desulfurization precipitator--Induced draft fan--The chimney
The flue gas--Induced draft fan--Wen`s pipe--Spray atomization desulfurization tower--chimey
The flue gas--Pulse bag filter--Induced draft fan--chimney
The secondary dust removal configuration
The flue gas--Ceramic multi-tube dust catche--water film desulfurization precipitator--Induced draft fan--chimney
The flue gas--Ceramic multi-tube dust catche--Wen`s pipe--water film desulfurization precipitator--Induced draft fan--chimney
The flue gas--Ceramic multi-tube dust catche--Induced draft fan--Spray atomization desulfurization tower--chimney
The flue gas--Ceramic multi-tube dust catche--Pulse bag filter--Induced draft fan--chimney
The flue gas--water film desulfurization precipitator--Induced draft fan--Spray atomization desulfurization tower--chimney
The flue gas--Pulse bag filter--Induced draft fan--The desulfurization device--chimney
 

 
 

 

 
 
 
Copyright @ 2015 Chongqing YongPu Thermoelectric Boiler Auxiliary Equipment Manufacturing Co., Ltd All Rights Reserved.
Address:Chongqing Yubei District stream street Jin Shanlu 18, 3-2 # 27 Tel:023-67480833